SAP ABAP Data Element MAHNSTAT (Dunning status)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷
PA-PA (Application Component) Personnel Administration
⤷
PBAS (Package) SAP HR Master Data Application Development
⤷
⤷
Basic Data
| Data Element | MAHNSTAT |
| Short Description | Dunning status |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR1 | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Dunn.stat. |
| Medium | 15 | Dunning status |
| Long | 20 | Dunning status |
| Heading | 0 |
Documentation
Definition
The date/deadline statuses have the following meaning:
- 0 => Neither the reminder nor the deadline dates have been reached.
- 1 => The date is being processed but processing has not been completed. According to the date, you should continue the processing.
- 2 => The deadline date has been maintained. No further processing required.
- 3 => The reminder date has been reached or exceeded. The deadline date has not been exceeded. There is still enough time to process the necessary steps.
- 4 => The deadline date has been reached but reminder date hasn't.
- 5 => The deadline date has already been exceeded, but the reminder date not.
- 6 => Both the deadline and reminder dates have been exceeded. Only follow-up processing is possible now.
Statuses 1 and 2 correspond to processing indicators 1 and 2 in infotype 0019 (Monitoring of Dates). The others correspond to the processing indicator <SPACE>.
History
| Last changed by/on | SAP | 19940827 |
| SAP Release Created in |