Hierarchy

⤷

⤷

Basic Data
Data Element | LEDSPD_AUTO_CORR |
Short Description | Control when correlated bills of material are split |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | LEDSPD_AUTO_CORR | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | AutoCorrl. |
Medium | 20 | Automat. correlation |
Long | 24 | Automatic correlation |
Heading | 10 | AutoCorrl. |
Documentation
Definition
Defines what should be done when the subsequent delivery split may potentially damage the correlation for bills of material (BOMs) whose correlation ratios and target ratios match at the moment.
You can tell whether the target ratio was kept constant by looking at the delivery's bill of materials. Specifically, if the quantity ratio between the BOM items remains the same as the ratio between the corresponding items of the preceding document, the target ratio was kept the same.
If the correlation ratio was damaged previously in the original delivery because of quantity changes made to sub-items, the checks or automatic quantity adjustments are not active. Automatic quantity adjustments take into consideration the fact that many BOM sub-items are not normally packed (small articles or hours of work, for example).
The system can check the situation or adjust quantities.
- Error message with control: LEDSP 048
'Correlation from &1 delivery group &3 impaired by item &2'.
If the error message control is set to "E" (system default), the split cannot be carried out. - Automatic correlation:
In order for automatic correlation to work, the items to be correlated must not: - require packing
- be packed
- have a batch split
- be specified when the split was called up
In addition, all split result quantities that were specified when the split was called up must include the correlation of the items in the bill of materials and must not have a batch split.
If the "with HU" limitation appears, all split result quantities of the bill of materials must also have been entered as contents of handling units (HU).
If the quantity adjustment function cannot be run even though the target ratio was kept in the original delivery, the system once again issues error messages with controls.
History
Last changed by/on | SAP | 19990312 |
SAP Release Created in |