SAP ABAP Data Element KWMBDAT_LIPS (Material Staging Date for Delivery in Calendar Weeks)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ PS-MAT-PRO (Application Component) Project-Oriented Procurement
⤷ CNMM (Package) Project oriented production and procurement
⤷ PS-MAT-PRO (Application Component) Project-Oriented Procurement
⤷ CNMM (Package) Project oriented production and procurement
Basic Data
Data Element | KWMBDAT_LIPS |
Short Description | Material Staging Date for Delivery in Calendar Weeks |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR7 | |
Data Type | CHAR | Character String |
Length | 7 | |
Decimal Places | 0 | |
Output Length | 7 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CW MatStag |
Medium | 15 | CW Mat. Staging |
Long | 20 | CW Mat. Staging |
Heading | 7 | MatStag |
Documentation
Definition
Date on which a sufficient quantity of the item must be available, so that picking can begin. This date applies only to deliveries from projects and is displayed here in calendar weeks.
Use
The system uses the material availability date to generate automatic production requests and purchase requisitions. The system determines the material availability date by calculating backwards from the requested delivery date. When it does this, it takes into account how much time is required for the activities related to the delivery such as picking, packing, loading, and transporting.
Procedure
The system proposes a material availabilty date. You can manually change the date in the sales documents.
Dependencies
The picking date is identical to the material availability date.
History
Last changed by/on | SAP | 20020225 |
SAP Release Created in |