SAP ABAP Data Element KKV_VGLWTP (Current Standard Cost Estimate for Target Cost Calculation)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0C (Package) Customizing for Cost Object Controlling
Basic Data
Data Element KKV_VGLWTP
Short Description Current Standard Cost Estimate for Target Cost Calculation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 StdCostEst 
Medium 15 Std Cost Est 
Long 24 Current Std Cost Est 
Heading
Documentation

Definition

Specifies whether the target costs are calculated on the basis of the current standard cost estimate for the material.

Use

You calculate the target costs on the basis of a standard cost estimate in the following situations:

Procedure

You turn on this indicator as an alternative strategy for valuating the work in process and scrap in the valuation variant for work in process and scrap. (See also: Define valuation variant for WIP and scrap (target costs).)

If you always want to calculate the work in process or scrap using the target costs calculated on the basis of a standard cost estimate, do not create a corresponding valuation variant. The system then calculates the work in process and scrap with the standard costs calculated on the basis of a standard cost estimate.

Examples

Suppose you have defined the following strategy sequence in the valuation variant for work in process and scrap:

  • 1 Planned costs / version-specific cost estimate
  • 2 Alternative material cost estimate
  • 3 Current standard cost estimate

If the system cannot find a preliminary cost estimate for the order or an alternative material cost estimate with the specified costing variant and costing version, it valuates the work in process and scrap on the basis of the standard cost estimate for the calculated target costs.

Dependencies

  • In make-to-stock production, if you turn on this indicator the system selects the standard cost estimate for the material.
  • In sales-order-related production, you can only calculate variances and scrap if you are using a valuated sales order stock.

    In this case, if you turn on this indicator the system will select the cost estimate used to calculate the standard price.

    You define how the standard costs are calculated with a valuated sales order stock under: Check requirements classes.

    For detailed information on the valuation of work in process and scrap, and on variance calculation and the valuation of goods receipts and on stanard price calculation with a valuated sales order stock, see the document Cost Object Controlling.

If you have changed the reporting point structure in the order, work in process and scrap cannot be valuated on the basis of a standard cost estimate for the material.