Basic Data
Data Element | KKA_VERW_C |
Short Description | Actual Results Analysis and Planned Results Analysis |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Act.+Plan |
Medium | 15 | Actual/Plan RA |
Long | 25 | Actual and Plan RA |
Heading | 1 | P |
Documentation
Definition
This indicator specifies whether results analysis for this results analysis version can calculate actual results analysis data and planned results analysis data.
Use
You select this indicator in the following situations:
- When you want to calculate planned results analysis data in addition to actual results analysis data
The planned results analysis data can be settled to Profitability Analysis (CO-PA) in integrated planning.
- To simulate future results analysis data
You can use the Actual and plan RA indicator to meet the requirements fulfilled by the Simulate actual with plan indicator.
For detailed information, see the documentation for the data element Simulate actual with plan.
Dependencies
This indicator is only relevant tointernal orders andprojects. Planned results analysis is not possible for sales order items because period-based planning is not possible here.
Actual results analysis data are calculated by valuating actual data on the basis of planned data. This is the same as results analysis performed on the basis of the settings under actual results analysis. This means that when it calculates planned results analysis data, the system accesses the same Customizing parameters as it does when it calculates actual results analysis data.
Planned results analysis data is calculated by valuating planned data on the basis of planned data:
- First, the planned data that replace the actual data is determined. This planned data is determined through the plan version entered in the Plan version field in the results analysis version under Planned results analysis.
- In addition, the planned data used to valuate the planned data determined under (1) must be determined. This planned data is determined by the plan version entered in the Plan version field in the Expert Mode of the valuation method.
If you want to use the planned results analysis data for integrated planning, you must plan by period.
Planned results analysis data cannot be transferred to Financial Accounting.
The planned results analysis data calculated on the basis of this indicator is updated under a special value type.
If you want to calculate planned results analysis data, you must select the Planed results analysis indicator in the application before you perform results analysis.