SAP ABAP Data Element KKA_VERW_B (Results Analysis: Simulate Actual Data with Plan Data)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0E (Package) Customizing for CO-PC Results Analysis and WIP Calculation
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0E (Package) Customizing for CO-PC Results Analysis and WIP Calculation
Basic Data
Data Element | KKA_VERW_B |
Short Description | Results Analysis: Simulate Actual Data with Plan Data |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Simulate |
Medium | 15 | Simulate Actual |
Long | 23 | Simulate Actual w/ Plan |
Heading | 1 | S |
Documentation
Definition
This indicator specifies that results analysis is performed as a simulation on the basis of the revenue planned up to the results analysis period.
Use
It is best to use Simulate actual with plan only if you have already generated results analysis data on the basis of this setting. If you have not generated any results analysis data on the basis of this setting, select the indicator Actual and plan RA.
Do not set this indicator for results analysis version 0. Instead, define an additional results analysis version and assign to it a valuation method that is suitable for this type of processing.
Dependencies
The calculation of simulated data valuates planned data on the basis of planned data:
- First, the planned data that replaces the actual data is determined (which planned revenue should replace the calculated revenue?). This planned data is determined by the version entered in the Version f. sim. field in the Expert Mode of the valuation method.
- In addition, the planned data used to valuate the planned data determined under (1) must be determined. This planned data is determined by the plan version entered in the Plan version field in the Expert Mode of the valuation method.
History
Last changed by/on | SAP | 19971020 |
SAP Release Created in |