Basic Data
Data Element | KKA_KSTTEC |
Short Description | Technical Results Analysis Cost Element |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KKG_KSTAR | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Tech CstEl |
Medium | 15 | Tech. RA CostEl |
Long | 31 | Technical RA Cost Element |
Heading | 10 | CElemC(av) |
Documentation
Definition
Cost element created for the following internal purposes:
- For calculating work in process (WIP calculation)
- For results analysis
Use
Work in Process
When work in process is calculated, the following data is updated under this cost element:
For the calculation of work in process, the valuated actual costs and the calculated costs are only used for internal purposes and do not require separate cost elements. All that is needed is a technical results analysis cost element.
Results Analysis
In results analysis, the following results analysis data is updated under this cost element:
- Valuated actual costs
- Calculated costs
- Capitalized profit
- Calculated revenue
- Revenue in excess of billings
- Revenue surplus
- Reserves for imminent loss
- Creation of reserve
- Usage of reserve
- Value adjustment
- Results analysis data calculated by the POC method such as:
- POC Profit increase
- POC Profit decrease
- POC Loss creation
- POC Loss cancellation
- POC Loss realization
- Other cost elements
- Valuated actual costs for complaints and commissions
- Variances in variance calculation for collective orders
The results analysis cost element for the results analysis data is only for internal purposes, so you don't need to create a separate cost element for each piece of results analysis data. You only need a technical results analysis cost element.
Procedure
Enter a technical results analysis cost element of cost element category 31 (order/project results analysis).