SAP ABAP Data Element KK_GEWBSE (Plan Value of Sales Order Cost Estimate)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0E (Package) Customizing for CO-PC Results Analysis and WIP Calculation
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0E (Package) Customizing for CO-PC Results Analysis and WIP Calculation
Basic Data
Data Element | KK_GEWBSE |
Short Description | Plan Value of Sales Order Cost Estimate |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SlsOrdCost |
Medium | 19 | Sales order cst est |
Long | 40 | Sales Order Cost Estimate |
Heading | 10 | SlsOrdCost |
Documentation
Definition
Controls whether results analysis uses the planned costs calculated in a sales order cost estimate.
Use
You use the Sales order cost estimate indicator particularly in complex make-to-order production because valuation using a sales order cost estimate is particularly appropriate there.
Dependencies
If you select this indicator, other cost estimates, such as the preliminary cost estimate for the manufacturing order or the standard cost estimate for the material, are not included in results analysis.
The order quantity and the planned revenue are taken from the sales order.
History
Last changed by/on | SAP | 19970923 |
SAP Release Created in |