SAP ABAP Data Element KK_GEWBSE (Plan Value of Sales Order Cost Estimate)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0E (Package) Customizing for CO-PC Results Analysis and WIP Calculation
Basic Data
Data Element KK_GEWBSE
Short Description Plan Value of Sales Order Cost Estimate  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 SlsOrdCost 
Medium 19 Sales order cst est 
Long 40 Sales Order Cost Estimate 
Heading 10 SlsOrdCost 
Documentation

Definition

Controls whether results analysis uses the planned costs calculated in a sales order cost estimate.

Use

You use the Sales order cost estimate indicator particularly in complex make-to-order production because valuation using a sales order cost estimate is particularly appropriate there.

Dependencies

If you select this indicator, other cost estimates, such as the preliminary cost estimate for the manufacturing order or the standard cost estimate for the material, are not included in results analysis.

The order quantity and the planned revenue are taken from the sales order.

History
Last changed by/on SAP  19970923 
SAP Release Created in