SAP ABAP Data Element KK_GEWBSC (Plan Value of Object and Dependent Objects)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0E (Package) Customizing for CO-PC Results Analysis and WIP Calculation
Basic Data
Data Element KK_GEWBSC
Short Description Plan Value of Object and Dependent Objects  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PlanAllObj 
Medium 15 Plan All Objs 
Long 40 Plan Value of Obj. and Dependent Objects 
Heading 10 PlanAllObj 
Documentation

Definition

This indictor controls whether the planned costs on which results analysis is based are calculated using the cost estimate of the object plus the cost estimates of the dependent objects.

Use

You set the Plan value of object and dependent objects indicator when you want to calculate the planned costs using the cost estimate of the object of results analysis (such as a sales order cost estimate plus the planned costs of the dependent objects (such as a preliminary cost estimate for the manufacturing order).

Dependencies

If you are using projects, set this indicator.

If you are using a nonvaluated sales order stock, using the planned costs calculated on the basis of a preliminary cost estimate for the production order is only recommended in assembly processing.

The planned revenue is derived from the sales order item.

History
Last changed by/on SAP  19970923 
SAP Release Created in