SAP ABAP Data Element KK_BVA (Valuation Variant for WIP and Scrap)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0C (Package) Customizing for Cost Object Controlling
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0C (Package) Customizing for Cost Object Controlling
Basic Data
Data Element | KK_BVA |
Short Description | Valuation Variant for WIP and Scrap |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AWBVA | |
Data Type | CHAR | Character String |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table | TKV13 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Val. Var. |
Medium | 15 | Val. Variant |
Long | 20 | Valuation Variant |
Heading | 3 | VVt |
Documentation
Definition
Key that identifies the valuation variance for work in process and scrap.
Use
The definition of the valuation variance for work in process and scrap determines how the target costs for the valuation of work in process and scrap are calculated.
Procedure
When you create a new valuation variant for work in process and scrap you enter a three-digit key to identify the valuation variant.
Dependencies
You assign the valuation variant for work in process and scrap to a results analysis version when you want to use them to valuate the work in process.
See also:
You specify the valuation for work in process and scrap in the target cost version 0 if you want to use it to valuate the scrap.
See also:
History
Last changed by/on | SAP | 19970910 |
SAP Release Created in |