SAP ABAP Data Element KAPA_D (Indicator: Determine capacity requirements)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
SRM-EBP (Application Component) Enterprise Buyer
⤷
CN (Package) R/3 Application development: PS Basic data
⤷
⤷
Basic Data
| Data Element | KAPA_D |
| Short Description | Indicator: Determine capacity requirements |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | FLAG | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Cap.Req. |
| Medium | 15 | Det. Cap. Req. |
| Long | 20 | Det. Cap. Reqmnts |
| Heading | 5 | CapRe |
Documentation
Definition
This indicator specifies that capacity requirements are determined for the following objects if assigned to the control key you selected:
- operations and sub-operations in Quality Management (QM), Plant Maintenance (PM) and Production Planning (PP)
- activities and activity elements in the Project System (PS)
- phases and secondary resources in Production Planning for Process Industries (PP-PI)
The system ignores this indicator if set for operations in PP-PI.
Dependencies
The system uses scheduling results to determine capacity requirements. Therefore, you should only set this indicator if you also set the indicator for scheduling.
History
| Last changed by/on | SAP | 20130604 |
| SAP Release Created in |