SAP ABAP Data Element JVBSM (Used for documentation of JVA schedule manager)
Hierarchy
EA-FIN (Software Component) EA-FIN
   CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
     GJVB (Package) Joint venture billing
Basic Data
Data Element JVBSM
Short Description Used for documentation of JVA schedule manager  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR01    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short  
Medium  
Long  
Heading  
Documentation

Joint Venture Billing Schedule Manager

Welcome to the Schedule Manager of Joint Venture Billing!

You can use this transaction (GJ15) for get all informations about schedules for JV Billing reports and set up new schedules.

How to use the billing schedule manager

A popup will show up which lets you choose to start the schedule manager or the schedule monitor. There are two different selections for them.

The schedule monitor shows all schedule jobs of the selected billing reports and selected time.

For the schedule manager you can choose a task list. There is a task list for the Joint Venture which you have to copy to the customer namespace for changing the schedule jobs.

Copy the Joint Venture task list

First you have to start the schedule manager using task list '0-SAP-JVA'. Now a popup will come up showing instruction on copying the task list (this popup will always show up if task list '0-SAP-JVA' is selected).

Then you will get to the schedule manager showing the task list and a calendar. To copy the task list choose 'Save as..' of menu 'Task List' and save the task list to your namespace.

To create or set variants to the billing reports you have to change the list using the 'Change task list' button on the toolbar. Now select the report you want to change and press the 'change entries' button on the list toolbar. On the program field you can create or set a variant and continue the screen.

When you finish all changes save your task list and press the toolbar button 'Back to scheduling' to start the work with the schedule manager.

History
Last changed by/on SAP  20130529 
SAP Release Created in 604