SAP ABAP Data Element JV_PERIOD (Posting period (Month))
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷ CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷ GJV2 (Package) Joint Venture Development
⤷ CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷ GJV2 (Package) Joint Venture Development
Basic Data
Data Element | JV_PERIOD |
Short Description | Posting period (Month) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BUPERIODE | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Pst.Period |
Medium | 15 | Posting Period |
Long | 20 | Posting Period |
Heading | 15 | Postin Period |
Documentation
Definition
Posting period will be used in combination with posting year. If the posting period is filled it will be used to determine the month in which the current postings should be made. Thus, the period entered in the posting period will appear as the posting date in the FI document. If the posting period is left blank, the current month (current date) will used for the posting date.
If the current date is within the posting year and period, the current date will be used for the posting date.
If the current date is not within the posting year and period, the last day of the configured posting year and period will be used for the posting date.
History
Last changed by/on | SAP | 20020108 |
SAP Release Created in |