Hierarchy
⤷ CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷ GJV2 (Package) Joint Venture Development
Basic Data
Data Element | JV_COSTO |
Short Description | Fill cost objects when initial |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Fill CO |
Medium | 15 | Fill CO |
Long | 20 | Fill Cost Object |
Heading | 7 | Fill CO |
Documentation
Definition
Fill cost object flag
If the cost object (cost center, order or WBS-element) is initial in the summary or single item JV-database record, which is used for this evaluation posting, this flag is used to decide how the cost object is set on the new posting line.
Flag is not marked
The record is only reported, but not posted. This JV-record is
skipped for the evaluation process
Flag is marked
If no cost object found in the summary or single item JV-database record,
then corporate cost object defined on the global company code parameters
is used.
If no corporate cost object has been defined then
substitution of the cost object occurs. The subsitute cost
object is taken from the Venture/EG/RI combination.
If the RI from the JV-record is defined in the substitution, this
cost object is taken, if not cost object is taken from the
substitution with a blank RI.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in |