SAP ABAP Data Element JMCETMNGNF (Schedule Line Quantity for Subsequent Schedule Line)
Hierarchy
☛
IS-M (Software Component) SAP MEDIA
⤷ IS-M (Application Component) SAP Media
⤷ JSD (Package) Appl. dev. R/3 Publishing Sales and Distribution System
⤷ IS-M (Application Component) SAP Media
⤷ JSD (Package) Appl. dev. R/3 Publishing Sales and Distribution System
Basic Data
Data Element | JMCETMNGNF |
Short Description | Schedule Line Quantity for Subsequent Schedule Line |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENGGPOS | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 13 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Subs.SLQty |
Medium | 15 | Subs.SLine Qty |
Long | 20 | Subs.Sched.Line Qty |
Heading | 10 | Subs.SLQty |
Documentation
Definition
Schedule line quantity for the schedule line subsequent to the current one in a logical chain.
The field is filled in the communication structures for the link between the sales order and the LIS. It can be used to identify quantity changes with regard to the subsequent schedule line by means of an LIS formula.
The subsequent schedule line is
- that for the subsequent item in sales document types that only have one schedule line per item (such as subscriptions)
- the subsequen schedule line within the current item for sales document types that have several schedule lines per item (such as retail orders).
If it is not possible to determine a subsequent schedule line, this quantity is zero.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |