Hierarchy
⤷ IS-M (Application Component) SAP Media
⤷ JAS (Package) Application development R/3 Publishing Advertising System***
Basic Data
Data Element | JHAGVX_FKDAT_BASIS |
Short Description | IS-M/AM: Base Date for Planned Settlement Date (Sales Agent) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | JHAGVX_FKDAT_BASIS | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Base date |
Medium | 15 | Base date |
Long | 20 | Base date |
Heading | 15 | Base date |
Documentation
Definition
The base date for determining the planned settlement date determines the date used to access the settlement calendar.
Use
The planned settlement date is determined as the next weekday in the settlement calendar with reference to the base date. The planned settlement date is always determined again if the settlement index is updated and this update is relevant to settlement.
Dependencies
The base date is defined for each purchasing organization .
If the possible values available do not match your requirements, you can use the SAP enhancement JHGV0002 (function exit EXIT_SAPLJHGV_002 to determine the planned settlement date.
Example
You use base date later date (actual billing /service date) together with the settlement calendar 'monthly on the first day of the month':
- Actual billing date = 11.03.1999
- Service date = 10.17.1999
- System date = 11.23.1999 (order billing)
The later date of a) and b) is 11.03.1999. The planned settlement date is therefore 12.01.1999.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |