Hierarchy
⤷ CRM-LOC-BR (Application Component) Brazil
⤷ J1BA (Package) Localization Brazil
Basic Data
Data Element | J_1BNFE_EVENT_SEQNO |
Short Description | Internal Sequence Number for Event |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC2 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | IntSeq.No. |
Medium | 17 | Internal Seq. No. |
Long | 31 | Internal Sequence No. for Event |
Heading | 13 | Int. Seq. No. |
Documentation
Definition
Indicates the number of times that you have sent or resent this event to the tax authorities.
Use
When you create and send an event, the system assigns #1# as the internal sequence number. After you receive a response from the tax authorities, you are allowed to create new events for this document. Whenever you create and send a new event of the same type to the tax authorities and receive a response, the system increases this internal sequence number by one.
Dependencies
Your messaging system also assigns a sequence number to this event. This is the official sequence number that is communicated to the tax authorities. The official sequence number and the internal sequence number can be different.
Example
You create and send an electronic correction letter (CC-e) for an NF-e. Your SAP ERP system assigns "1" as the internal sequence number. You send the CC-e to the messaging system. The messaging system returns a validation error to your SAP ERP system.
You fix the error and send the CC-e to the messaging system again. The internal sequence number remains "1". The tax authorities send a rejection. You create a new version of the CC-e and send it to the tax authorities. Your SAP ERP system changes the internal sequence number to #2#. This time the CC-e is authorized.
History
Last changed by/on | SAP | 20140121 |
SAP Release Created in | 606 |