Hierarchy
⤷ CRM-LOC-BR (Application Component) Brazil
⤷ J1BA (Package) Localization Brazil
Basic Data
Data Element | J_1BNFE_ACTION_REQUIRED |
Short Description | Required Process Step |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | J_1BNFE_ACTION_REQUIRED | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Step |
Medium | 15 | Process Step |
Long | 25 | Required Process Step |
Heading | 55 | Required Process Step |
Documentation
Definition
Indicates, if applicable, the action that you need to perform to continue processing in the Monitor. The following statuses do not require an action:
- Blank
- C: Completed
- A: Numbering will be done via batch report; no action required
- B: Sending will be done via batch report; no action required
Use
Dependencies
The step entered here is directly related to the icon in the Action Status column:
- Steps 2, 3, 6, 7 and 0 indicate that manual action is required, but it is part of normal processing (corresponds to yellow exclamation mark)
- Steps 1, 4, 5, 8 and 9 indicate that manual action is required, but an error or problem has occurred (corresponds to red arrow)
Note that although you perform the required action, the status does not change to C (completed) until the entire process is completed, as illustrated in the example below.
Examples
You switch an individual NF-e to contingency processing. You must manually cancel the NF-e by canceling the corresponding Sales and Distribution (SD) or Materials Management (MM) document. The system displays a yellow exclamation mark and step 2 (cancel NF-e). Although you cancel the corresponding document in the back-end system, the process step remains as 2 and the corresponding Action Status icon remains a yellow exclamation point until you receive the necessary cancellation authorization from the authorities. After you receive this authorization, the process is completed, and the system updates the process step to C and changes the action status to the flag icon.
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 604 |