SAP ABAP Data Element J_1AUPDONE (Material master update performed)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CA-GTF-CSC (Application Component) Country-Specific Objects
⤷ J1AI (Package) Extended inflation FI
⤷ CA-GTF-CSC (Application Component) Country-Specific Objects
⤷ J1AI (Package) Extended inflation FI
Basic Data
Data Element | J_1AUPDONE |
Short Description | Material master update performed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | MM-Update |
Medium | 15 | MM-Update done |
Long | 20 | MM-Update done |
Heading | 27 | Material master update done |
Documentation
Definition
The field indicates if the replacement cost revaluation has been run in update-mode (value = 'X') or not (left blank), that is if the relevant dates and prices have been updated correctly by either market price revaluation or inflation index revaluation.
History
Last changed by/on | SAP | 19980218 |
SAP Release Created in |