Hierarchy
⤷ CA-GTF-CSC (Application Component) Country-Specific Objects
⤷ J1AI (Package) Extended inflation FI
Basic Data
Data Element | J_1AREVDTP |
Short Description | Last Revaluation Date - Previous Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rev. date |
Medium | 15 | Reval. date |
Long | 20 | Revaluation date |
Heading | 20 | Revaluation date |
Documentation
Definition
Specifies the date from which a new replacement cost is valid if, in update mode, a replacement cost is determined in the previous period. If you post the replacement cost as a price change, the revaluation date additionally specifies the date up to which your materials have been revaluated.
Use
The system uses the revaluation date together with the processing date to ensure that materials are adjusted consistently.
Dependencies
Since revaluation is in the previous period, the last revaluation date can be determined by either of these reports:
- Market Price Determination
In this case, the system sets the end date you specified on the report selection screen.
- Inflation Index Adjustment
In this case, the system sets the last day of the previous period.
If you change the replacement cost manually, the system resets the revaluation date to the system date of the change or, if the system date is after the last day of the period, the date is reset to the last day of the previous period.
History
Last changed by/on | SAP | 20010221 |
SAP Release Created in |