SAP ABAP Data Element J_1AREVDTC (Last Revaluation Date - Current Period)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CA-GTF-CSC (Application Component) Country-Specific Objects
⤷ J1AI (Package) Extended inflation FI
⤷ CA-GTF-CSC (Application Component) Country-Specific Objects
⤷ J1AI (Package) Extended inflation FI
Basic Data
Data Element | J_1AREVDTC |
Short Description | Last Revaluation Date - Current Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rev. date |
Medium | 15 | Reval. date |
Long | 20 | Revaluation date |
Heading | 20 | Revaluation date |
Documentation
Definition
Specifies the date from which a new replacement cost is valid if, in update mode, the Market Price Determination report determines a replacement cost in the current period. If you post the replacement cost as a price change, the revaluation date additionally specifies the date up to which your materials have been revaluated.
Use
The system uses the revaluation date together with the processing date to ensure that materials are adjusted consistently.
Examples
Dependencies
The system sets the revaluation date to the end date you specified on the Market Price Determination report selection screen. If you change the replacement cost manually, the system resets the revaluation date to the system date of the change.
History
Last changed by/on | SAP | 20010221 |
SAP Release Created in |