SAP ABAP Data Element IST (Actual data in FM area currency)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   TR-CB (Application Component) Cash Budget Management
     FFCBR (Package) Cash Budget Management - Reporting
Basic Data
Data Element IST
Short Description Actual data in FM area currency  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERT8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 20    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Act.data 
Medium 15 Act.data - FMAC 
Long 15 Act.data - FMAC 
Heading 15 Act.data - FMAC 
Supplementary Documentation - ISTAT_D 1000

Use

Status feature for objects and relationships which are created in HR-PD using report RHINTE00.

Procedure

Examples

Dependencies

When using report RHINTE00, only the status 'active' is allowed for the integration plan version. In other plan versions you can work with 'active' or 'planned'.

Supplementary Documentation - ISTAT_D 2100

Use

Use this field to identify the status you want to apply to the objects and infotypes you create in Graphics. To do so either:

  • type in the appropriate 1-digit code, or
  • request a list of statuses and make a selection by either:
    . pressing F4, or
    . clicking on the down arrow

Supplementary Documentation - ISTAT_D 3500

Use

Procedure

Example

Dependencies

Supplementary Documentation - ISTAT_D 7001

Use

Planning status of room reservation.

Room reservations can be scheduled in status

1 = firmly booked or

2 = reserved

Room reservations that were only reserved at first must then be transferred to status 1 = firmly booked once the dates are definitive. The "Firmly book" function enables you to do this. This is done with the function "Firmly book".

Supplementary Documentation - ISTDF 0001

Use

In Overhead Cost Controlling (CO-OM), the system always records actual data in version 000.

The only exceptions to this rule at present are the delta versions in Activity Based Costing (CO-OM-ABC).

Supplementary Documentation - ISTRU 0001

Use

By making an entry in this field, you can:

  • identify specifically the maintenance task lisk as being for a particular assembly.

    To do this, specify the number of the required assembly in this field.

  • identify specifically the maintenance task list as being for a particular object type.

    To do this, specify the number of the required construction type in this field.

Procedure

Examples

Dependencies

If you specify the number of a construction type here, the System selects during an object-related task list search in the maintenance order, all task lists that are valid for the reference object and all task lists that are valid for the construction type specified in the master data of the reference object.

Supplementary Documentation - ISTXT 0001

Use

Enter here a meaningful short description of the information structure.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  19990412 
SAP Release Created in