SAP ABAP Data Element INTRVALL3 (Days between scheduled reading date and sched. billing date)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BF-PS (Application Component) Portioning and scheduling
     EE15 (Package) IS-U: Scheduling
Basic Data
Data Element INTRVALL3
Short Description Days between scheduled reading date and sched. billing date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUM3    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 SMR-SBill. 
Medium 15 Sch.MR-SchBill. 
Long 20 SchedMR - SchedBill. 
Heading Days 
Documentation

Use

The number of days between the scheduled meter reading date and the scheduled billing date are only given for information purposes.

Dependencies

If you use the SAP calendar, the days are workdays.

If you do not use the SAP calendar, the days are calendar days.

History
Last changed by/on SAP  20050224 
SAP Release Created in