SAP ABAP Data Element INT_TARGET_READ (Interval btw. scheduled reading date and end of billing per.)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BF-PS (Application Component) Portioning and scheduling
     EE15 (Package) IS-U: Scheduling
Basic Data
Data Element INT_TARGET_READ
Short Description Interval btw. scheduled reading date and end of billing per.  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type INTERVALL    
Data Type DEC   Counter or amount field with comma and sign 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short  
Medium  
Long  
Heading 42 Scheduled reading date - end of bill. per. 
Documentation

Use

Is taken into account when calculating the planned meter reading date. In the process, the interval is always interpreted to be negative.

Example

The start date is the end of the billing period and the target date is the planned meter reading date.

The interval between the start date and the scheduled date was defined as four days. The scheduled date must be before the start date.

  1. If the start date falls on a Friday, the scheduled date is the previous Monday.
  2. If the start date falls on a Wednesday, the scheduled date is:
    1. The previous Saturday if you have not maintained a factory calendar
    2. The previous Thursday if you have maintained a factory calendar.

History
Last changed by/on SAP  20050224 
SAP Release Created in