SAP ABAP Data Element IMA_WDATU (Desired date for start of implementation)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   IM-FA-IA (Application Component) Appropriation Requests
     AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
Basic Data
Data Element IMA_WDATU
Short Description Desired date for start of implementation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name DESIRED_START   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Impl.start 
Medium 15 Implemen.start 
Long 20 Implementation start 
Heading 10 Impl.start 
Documentation

Definition

The desired start date is the date the applicant would like the measure requested in the appropriation request to be implemented, that is actually carried out.

Use

This field is for informational purposes only.

History
Last changed by/on SAP  19991209 
SAP Release Created in