SAP ABAP Data Element IMA_WAERS (Object currency of the appropriation request)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ IM-FA-IA (Application Component) Appropriation Requests
⤷ AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
⤷ IM-FA-IA (Application Component) Appropriation Requests
⤷ AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
Basic Data
Data Element | IMA_WAERS |
Short Description | Object currency of the appropriation request |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WAERS | |
Data Type | CUKY | Currency key, referenced by CURR fields |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 5 | |
Value Table | TCURC |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | OBJECT_CURRENCY | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Currency |
Medium | 15 | Currency |
Long | 20 | Currency |
Heading | 5 | Crcy |
Documentation
Definition
You can plan on appropriation requests, dependent on the plan profile, in the controlling area currency, the object currency, or both. In each case, you can display the plan values in the other currency.
When you create an appropriation request, the system proposes the company code currency as the object currency. You can overwrite this proposal if these conditions are met:
- The controlling area of the appropriation request does not allow a different company code currency.
- There are no plan values yet.
- No orders or WBS elements are assigned.
The object currency is adopted by orders or WBS elements when they are created. Costs and payments on measures are managed in the controlling area currency and in the object currency.
History
Last changed by/on | SAP | 19991209 |
SAP Release Created in |