SAP ABAP Data Element IMA_IPOSNR (WBS element investment project)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ IM-FA-IA (Application Component) Appropriation Requests
⤷ AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
⤷ IM-FA-IA (Application Component) Appropriation Requests
⤷ AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
Basic Data
Data Element | IMA_IPOSNR |
Short Description | WBS element investment project |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PS_POSNR | |
Data Type | NUMC | Character string with only digits |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 24 | |
Value Table | PRPS |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | WBS elem. |
Medium | 15 | WBS element |
Long | 20 | WBS element |
Heading | 24 | WBS element |
Documentation
Definition
WBS elements can be used as measures for implementing appropriation requests.
Use
You can have the system create new projects automatically, or you can assign existing WBS elements to the appropriation request.
When you use automatic creation, the data is adopted from the appropriation request. You can specify if the plan values are adopted completely or partially during this automatic creation.
When creating multiple measures, the system ensures that no more than 100% of the plan values are transferred to the measures in total, and that (sub)calculations are only transferred once.
History
Last changed by/on | SAP | 19991209 |
SAP Release Created in |