SAP ABAP Data Element IMA_AKOSTL3 (Requesting cost center 3 - mass change)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   IM-FA-IA (Application Component) Appropriation Requests
     AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
Basic Data
Data Element IMA_AKOSTL3
Short Description Requesting cost center 3 - mass change  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KOSTL    
Data Type CHAR   Character String 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table CSKS    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID KOS  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CstCtr 3 
Medium 15 Cost center 3 
Long 20 Cost center 3 
Heading 10 CstCtr 3 
Documentation

Definition

Here you enter the cost center that requested the appropriation request.

Use

When you enter a requesting cost center, the system adopts the company code of the cost center as the requesting company code.

The requesting company code is most important when you create an investment measure from the appropriation request.

The requesting company code is the company code in which the asset under construction for an investment measure is managed.

You only need to enter a requesting code if the asset under construction belonging to an investment measure (order or WBS element) should be managed in a different company code than the investment measure (cross-company-code settlement of asset under construction). Otherwise the requesting company code is the same as the company code of the investment measure (order or WBS element).

History
Last changed by/on SAP  19991209 
SAP Release Created in