SAP ABAP Data Element ICON_LIGHT (Lights icon for the pull list)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
PP-REM (Application Component) Repetitive Manufacturing
⤷
MD04 (Package) Repetitive Manufacturing
⤷
⤷
Basic Data
| Data Element | ICON_LIGHT |
| Short Description | Lights icon for the pull list |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | SYCHAR132 | |
| Data Type | CHAR | Character String |
| Length | 132 | |
| Decimal Places | 0 | |
| Output Length | 132 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 0 | |
| Medium | 0 | |
| Long | 0 | |
| Heading | 0 |
Documentation
Definition
Represents the various staging statuses for the requirements totals:
- Green light
- For these requirements totals, no staging is necessary as the requirements are already covered by available stock. No unprocessed replenishment elements have been created.
- For these requirements totals, replenishment elements have been created which have been successfully reprocessed in the replenishment element view (however, these replenishment elements still have to be posted).
- Yellow light
- For these requirements totals, replenishment elements have been created which have not yet been completely processed in the replenishment element view.
- Red light
- Missing quantities exist for these requirements totals. Not enough replenishment elements have been created.
History
| Last changed by/on | SAP | 19990312 |
| SAP Release Created in |