SAP ABAP Data Element ICL_DONEMODE (Task Flagged as Completed After Navigation)
Hierarchy
☛
INSURANCE (Software Component) SAP Insurance
⤷ FS-CM (Application Component) Claims Management
⤷ ICL_CDC (Package) FS-CM: Data Capture
⤷ FS-CM (Application Component) Claims Management
⤷ ICL_CDC (Package) FS-CM: Data Capture
Basic Data
Data Element | ICL_DONEMODE |
Short Description | Task Flagged as Completed After Navigation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | DoneNavig. |
Medium | 20 | Done Thru Navigation |
Long | 38 | Task Completed Through Navigation |
Heading | 38 | Task Completed Through Navigation |
Documentation
Definition
Means that the system flags the task as Completed as soon as you navigate to the relevant screen under the control of activity management.
Use
You should normally only set this flag with tasks that are for information purposes, in other words tasks in which the user does not have to check anything or perform any activity.
If you do not select the checkbox, the task is flagged as Completed in the following other cases:
- Once you have navigated to the relevant screen in Activity Management, you can manually flag the task as Completed (this is typically the case with tasks of a "Check..." nature).
- Once you have navigated to the relevant screen in Activity Management and performed the activities for this task, the system flags the task as Completed (this is typically the case with tasks of a "Complete Data" nature).
Dependencies
Example
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 463 |