Hierarchy
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
Basic Data
Data Element | HRSP_USE_ACTUAL |
Short Description | Select Current Optional Settings |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CUA_CHOICE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Act. |
Medium | 15 | Current |
Long | 29 | Use current settings |
Heading | 4 | Act. |
Documentation
Definition
Here, you can specify whether the options you have just set should be used as default values, or whether any options set in the current shift plan can overwrite them.
Example
The assignment options that you have just set for automatic proposal determination are to be used as default values, and each can be changed by the shift planner.
To set this up, set Use current settings for each option.
If a shift planner now makes new settings in the current shift plan that deviate from the options set for the strategy, the system uses the settings made in the shift plan for automatic proposal determination.
Procedure
Select this field in order to permit assignment options differing from those set for the strategy to be made in the shift plan.
Note
For proposal determination of the validity period, the option is set and transferred using the Shift Planning transaction, and not using table T77EVOPT.
History
Last changed by/on | SAP | 20000120 |
SAP Release Created in |