SAP ABAP Data Element HRSP_SPLIT2_D (Split Working Time for Assignment)
Hierarchy
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
   PT-SP (Application Component) Shift Planning
     PP08 (Package) Shift Planning
Basic Data
Data Element HRSP_SPLIT2_D
Short Description Split Working Time for Assignment  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CUA_CHOICE    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Complete 
Medium 20 Do not split wrktime 
Long 34 Do not split working time 
Heading 34 Do not split working time 
Documentation

Definition

Here you specify that the assignment of employees to requirements should only take place if the requirements interval would cover the employee's working time.

Example

An exmployee works daily from 8:00 a.m. to 5:00 p.m. You want to assign this employee to the requirements interval 8:30 a.m. to 6:00 p.m.
The assignment can not be made because the employee's worksing time would not be covered by the requirements interval.

History
Last changed by/on SAP  20000120 
SAP Release Created in