SAP ABAP Data Element HRSP_MONTH_LIST (Print a list for each month)
Hierarchy
☛
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
Basic Data
Data Element | HRSP_MONTH_LIST |
Short Description | Print a list for each month |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 9 | Monthly |
Medium | 11 | Monthly |
Long | 11 | Monthly |
Heading | 35 | Print a list for each month |
Documentation
Definition
Specify that the processing period for shift planning is to be divided into monthly intervals for display.
Use
You can specify that the page display for the shift plan should consist of one of the following:
- all in one list
- monthly
- weekly
Example
The processing period for a shift plan begins 01 February and ends 30 April.
You want to display each separate month of the shift plan.
In the Display page layout group box, select the monthly input field.
The page display now displays each separate month.
Procedure
To display each separate month of a processing period of a shift plan, select monthly.
History
Last changed by/on | SAP | 20000104 |
SAP Release Created in |