SAP ABAP Data Element HRSP_BA_ONE_LIST (Print Entire Processing Period in One List)
Hierarchy
☛
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
Basic Data
Data Element | HRSP_BA_ONE_LIST |
Short Description | Print Entire Processing Period in One List |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | One List |
Medium | 20 | Print All in a List |
Long | 20 | Print All in a List |
Heading | 32 | Print All in One List |
Documentation
Definition
You specify in this field that the entire processing period of the requirements matchup is output.
Use
You can define the page display of the requirements matchup as follows:
- Everything in a list
- Monthly
- Weekly
Procedure
To output the entire processing period of a requirements matchup, select Print All in a List.
History
Last changed by/on | SAP | 20050109 |
SAP Release Created in | 600 |