SAP ABAP Data Element HRSP_ADOPT_SUB_D (Adjust by Altering Working Time)
Hierarchy
☛
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
Basic Data
Data Element | HRSP_ADOPT_SUB_D |
Short Description | Adjust by Altering Working Time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CUA_CHOICE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Substitute |
Medium | 20 | By altering |
Long | 30 | by moving working time |
Heading | 38 | Adjust by altering working time |
Documentation
Definition
This adjustment type modifies an employee's working time to match the requirement to which he or she is assigned.
Example
An employee works daily from 8:00 a.m. to 5:00 p.m, and is assigned to a requirements record defined with a daily working time of 8:30 a.m to 5:30 p.m.
This assignment causes the the employee to be assigned a working time that deviates from one of the usual working times.
Notes
In Time Management, the deviating working time of this employee caused by this assignment is created as a substitution.
History
Last changed by/on | SAP | 20000120 |
SAP Release Created in |