SAP ABAP Data Element HR_PY_BEG (Start Date of Payroll Result Period)
Hierarchy
SAP_BASIS (Software Component) SAP Basis Component
   BC-BMT-OM (Application Component) Organizational Management
     SP00 (Package) Organization and Planning
Basic Data
Data Element HR_PY_BEG
Short Description Start Date of Payroll Result Period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short From 
Medium 20 Payroll results from 
Long 30 Payroll result period 
Heading 40 Start date of payroll result period 
Documentation

Definition

If payroll results from HR Payroll are used in Personnel Cost Planning, the period as of which the payroll results are to be used must be entered here. When you do this, SAP recommends that you only use the payroll results from one payroll period. In this case, only one key date need be entered under start date and end date, since all payroll results that intersect the period indicated are used. If the planning period for Cost Planning is longer than the period as of which the payroll results are used, the remainder of the period is filled with the last results.

Example

Entry: Start date 15.01.1994, End date 15.02.1994, Payroll results are available for the following periods: 01.01.1994 - 31.01.1994, 01.02.1994 - 28.02.1994, ....

The first two payroll results are now selected.

Note

If suitably configured, HR Payroll can create simulation invoices for the future, the results of which can become the basis of Personnel Cost Planning.

History
Last changed by/on SAP  20010130 
SAP Release Created in