SAP ABAP Data Element HCP_GET_COINFO (Flag: Determine CO Account Assignment)
Hierarchy
☛
EA-HRGXX (Software Component) Sub component EA-HRGXX of EA-HR
⤷ PA-CP (Application Component) Personnel Cost Planning and Simulation
⤷ PAOC_HCP_BW (Package) HCP BW
⤷ PA-CP (Application Component) Personnel Cost Planning and Simulation
⤷ PAOC_HCP_BW (Package) HCP BW
Basic Data
Data Element | HCP_GET_COINFO |
Short Description | Flag: Determine CO Account Assignment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | HCP_SWITCH | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 4 | CO |
Medium | 15 | CO Acc. Assignm |
Long | 20 | Det. CO Acc.Assignmn |
Heading | 20 | CO Account Assignmnt |
Documentation
Definition
Specifies whether the operative system determines the account assignment of the individual cost items in Controlling when data is extracted from personnel cost plans to the SAP Business Information Warehouse (SAP BW).
Use
Set this indicator if you want to perform reports in the controlling view in SAP BW.
Dependencies
In the case of personnel cost plans you have already created in the controlling view, you only need to set this indicator if you also need the account assignment objects fund, functional area, and grant for your reports.
If you set this indicator the runtime for extracting data is lengthened. Furthermore, splitting the cost items as part of cost distribution may result in rounding differences in the amounts and a higher data volume.
Example
History
Last changed by/on | SAP | 20030326 |
SAP Release Created in | 200 |