SAP ABAP Data Element GM_PGRANT_NBR (Partner Grant)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-PSM (Application Component) Cross Application Objects Public Sector Management
     BFMB (Package) Basis Objects FI-FM
Basic Data
Data Element GM_PGRANT_NBR
Short Description Partner Grant  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type GM_GRANT_NBR    
Data Type CHAR   Character String 
Length 20    
Decimal Places 0    
Output Length 20    
Value Table      
Further Characteristics
Search Help: Name GRANTS_GENERIC    
Search Help: Parameters GRANT_NUMBER   
Parameter ID   
Default Component name PARTNER_GRANT_NBR   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Prtnr Grnt 
Medium 15 Partner Grant 
Long 20 Partner Grant 
Heading 20 Partner Grant 
Documentation

Definition

Legal recognition that defines a financial relationship between the grantee and the sponsor. The aim is to support or sponsor a public sponsored program in which the sponsor does not expect to play a significant role.

The grant can serve any purpose. It can cover the total costs of a project or only a part of it. You have to enter a grant type for each grant you create in Grants Management (GM).

The grant has a limited life cycle which is divided into different phases. In GM, each phase has a system status:

  • First Version
  • The first phase in which you can change and edit the grant without restrictions.
  • Proposal
  • The proposal is the formal, complete document created from the first version.
  • Application
  • If the proposal is sent to the sponsor for approval, an application is created. The application contains budget changes or other adjustments, for example.
  • Assignment
  • If the sponsor approves the application, an assignment is created. This is the operative phase of the grant. The budget is entered and consumed in this phase. This phase maps the legally-binding contract between the sponsor and the grantee.
  • Closing
  • The phase when an assignment expires is called the closing. Editing the grant is restricted in this phase.
  • Final Closing
  • The grant has expired and is closed. It can be archived, but no other action is permitted.

History
Last changed by/on SAP  20110908 
SAP Release Created in 700