SAP ABAP Data Element GM_BDGT_AMOUNT_TYPE (Amount type for GM budgeting)
Hierarchy
☛
EA-PS (Software Component) SAP Enterprise Extension Public Services
⤷
PSM-GM-GTE-BU (Application Component) Budgeting and Availability Control
⤷
GMBUDGETING_E (Package) Grants management (budgeting)
⤷
⤷
Basic Data
| Data Element | GM_BDGT_AMOUNT_TYPE |
| Short Description | Amount type for GM budgeting |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | GM_BDGT_AMOUNT_TYPE | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | AmountType |
| Medium | 15 | Amount Type |
| Long | 20 | Amount Type |
| Heading | 11 | Amount Type |
Documentation
Definition
Defines the budget entered in the Grants Management (GM) budgeting workbench as a 'net' or 'total' amount for the total grant budget (for example: Direct budget, Indirect Cost budget and Cost Sharing budget = Total Grant Budget).
Use
- If the "Net" setting is selected, the budget entered in the Direct Amount field represents the Grant's Direct cost budget. The budget needed for Indirect Costs and/or Cost Sharing will be added to the Grant's Direct cost budget to calculate the Total Grant budget. The Total Grant budget would be calculated as follows:
- Total Grant budget = Direct Cost budget + Indirect Cost budget + Cost Sharing budget
- If the "Total" setting is selected, the budget entered in the Direct Amount field represents the Total Grant budget. The budget needed for Indirect Costs and/or Cost Sharing will be subtracted from the Total Grant budget to calculate the Direct Cost budget. The Direct Cost budget is calculated as follows:
- Direct Cost budget = Total Grant budget - Indirect Cost budget - Cost Sharing budget
In both cases, the relevant amount for ledger postings (including availability control) is the net amount.
Dependencies
Set the value in GM Budget Transaction Settings.
Example
History
| Last changed by/on | SAP | 20050411 |
| SAP Release Created in | 600 |