SAP ABAP Data Element GESKOS (Planned Combined Costs for Approp. Request Variant)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
IM-FA-IA (Application Component) Appropriation Requests
⤷
AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
⤷
⤷
Basic Data
| Data Element | GESKOS |
| Short Description | Planned Combined Costs for Approp. Request Variant |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | WERTV8 | |
| Data Type | CURR | Currency field, stored as DEC |
| Length | 15 | |
| Decimal Places | 2 | |
| Output Length | 21 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Comb.costs |
| Medium | 15 | Combined costs |
| Long | 20 | Combined costs |
| Heading | 20 | Combined costs |
Documentation
Definition
Costs that are planned for an appropriatian request variant. These costs are the sum (=total) of the overhead costs and the investment costs for the variant.
Please note that you can plan only the investment costs separately. The system determines the overhead costs portion by subtracting the investment costs from the combined costs.
History
| Last changed by/on | SAP | 19991209 |
| SAP Release Created in |