Hierarchy

⤷

⤷

Basic Data
Data Element | G_DAT |
Short Description | Delimitation date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Documentation
Definition
Date to which the end date of an object's or infotype's validity period is changed or postponed.
Use
You want to change or postpone the validity period of an object.
All data records whose validity period starts after the delimitation date are deleted. Otherwise, only that part of the data record is deleted that is after the delimitation date.
Supplementary Documentation - GIDAT 0001
Use
This is the date on which the recount is planned to take place.
Supplementary Documentation - GIDAT 0002
Use
Procedure
You have the following options for entering your selection criteria for this field:
- Enter an individual value in this field.
- Enter an interval of values (from - to) in this and the adjacent field.
- Click on the arrow next to the field to enter several intervals or individual values.
All documents that satisfy your selection criteria will be displayed. (Copied from TX,SELECT_CRITERIA)
Examples
Dependencies
Supplementary Documentation - GIDAT 0003
Use
Here you enter the date on which the physical inventory is to be carried out.
The system proposes the planned date. If no date has been maintained, the system proposes the current date.
Examples
Dependencies
Supplementary Documentation - GIDAT 0004
Use
The system checks for which materials physical inventory is to be carried out during the specified interval.
Procedure
Examples
A given material is to be cycle counted every 10 workdays. The last physical inventory was carried out on Wednesday two weeks ago. Consequently, the next physical inventory for this material is due this coming Wednesday.
If you plan a cycle count for next week (count date interval = Monday through Friday), counting of the relevant material will be scheduled for Wednesday.
Dependencies
Supplementary Documentation - G_DAT 1000
Use
In this field you specify when the delimitation of an object or an infotype record takes effect. The system then executes the delimitation on the following day. This means that all data records that exist after the date you enter are delimited.
This field is defaulted to the current date, but you can specify a date in the future.
Procedure
To complete the field:
- choose <Enter> to accept the default, or
- enter a new date by typing over the default.
History
Last changed by/on | SAP | 20010130 |
SAP Release Created in |