Hierarchy
⤷ PLM-RM (Application Component) Recipe Management
⤷ RMSFRMINFMSC (Package) RMS-FRM: General Modules for INF Package
Basic Data
Data Element | FRMLE_SUBPRS |
Short Description | Substance Price per Base Unit of Measure |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERT11V | |
Data Type | CURR | Currency field, stored as DEC |
Length | 11 | |
Decimal Places | 2 | |
Output Length | 15 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Subs.Price |
Medium | 15 | Substance Price |
Long | 30 | Substance Price per Base UoM |
Heading | 30 | Substance Price per Base UoM |
Documentation
Definition
Price of a substance that is specified as a property of the specification.
Use
The substance price is chosen for costing if the priority is higher than that of the material price, or if no price exists that has a higher priority. You can recognize if the substance price is being used for costing because the field is colored.
You can change the prices that are used for a material or substance. Select the appropriate line and then choose the price that you want using one of the following pushbuttons in the toolbar:
- Use Material Price
- Use Substance Price
- Use Manually Set Price
Then you have to trigger a new calculation using the Perform New Costing pushbutton.
Dependencies
You have specified the priorities for the prices to be used in costing (material, substance, or manually entered price) in Customizing.
When you use the value assignment type supplied with the standard system, you specify the substance price in Specification Management in the property tree.
The currency and unit of measure related to the price are displayed in the Curr./UoM field. The values are copied by default from the parameters to the costs dialog.
Example
History
Last changed by/on | SAP | 20031212 |
SAP Release Created in | 471 |