SAP ABAP Data Element FRM_WORKING_DAY_SCHEDULING (Scheduling in working days)
Hierarchy
BBPCRM (Software Component) BBPCRM
   LO-MDS (Application Component) Merchandise Distribution
     WFRM (Package) ISR: Cross-Docking and Floor-Ready Merchandise
Basic Data
Data Element FRM_WORKING_DAY_SCHEDULING
Short Description Scheduling in working days  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1_X    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 In wrk dy 
Medium 15 In working days 
Long 27 Scheduling in working days 
Heading In wrk dy 
Documentation

Definition

Determines whether collective purchase orders are scheduled in working days or in calendar days (in line with the factory calendar)

Use

Set this indicator if collective purchase orders are to be scheduled in working days as per the factory calendar.

Example

The schedule line interval starts on a Wednesday. Monday to Friday are marked as working days in the factory calendar. The schedule line interval is five days.

  • Scheduling in calendar days

    The end of the schedule line interval is set to the following Monday.

    Note:

  • If the Monday is not a working day, the system automatically selects the next working day.
  • Sceduling in working days.

    The end of the schedule line interval is set to the following Wednesday.

History
Last changed by/on SAP  19990504 
SAP Release Created in