SAP ABAP Data Element FMEUF_PREVP (Previous Phase Required)
Hierarchy
☛
EA-PS (Software Component) SAP Enterprise Extension Public Services
⤷ PSM-EC (Application Component) Expenditure Certification
⤷ FMEUF_E (Package) Expenditure Certification
⤷ PSM-EC (Application Component) Expenditure Certification
⤷ FMEUF_E (Package) Expenditure Certification
Basic Data
Data Element | FMEUF_PREVP |
Short Description | Previous Phase Required |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUM2 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Pr. Phase |
Medium | 15 | Previous Phase |
Long | 20 | Previous Phase |
Heading | 2 | PP |
Documentation
Definition
Number of the phase required prior to the current one.
Use
If the current certification phase needs to be run after a previous one, this must be specified here.
Dependencies
Example
In this sample certification procedure, two certification runs are required, with the following phases:
- Certification of the funds commitment
- Subsequent certification of the corresponding invoices
The first phase is only permitted for funds commitments, while the second is only permitted for invoices.
Furthermore, the second phase has as its prerequisite the execution of the first phase.
History
Last changed by/on | SAP | 20070913 |
SAP Release Created in | 600 |