SAP ABAP Data Element FLG_EXP_C_EN (MPX export of constraints: Finish before start)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-ST-INT (Application Component) Interface to External Project Software
⤷
CN_MPX_IF (Package) MPX Interface

⤷

⤷

Basic Data
Data Element | FLG_EXP_C_EN |
Short Description | MPX export of constraints: Finish before start |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Fin. |
Medium | 15 | Finish < start |
Long | 20 | Finish before start |
Heading | 3 | F |
Documentation
Definition
Specifies that if there are constraints for both the start date and the finish date of an activity in the SAP system, the constraint for the finish date is transfered to the MPX file.
Use
In the SAP system an activity can have constraints on both the start and finish dates.
However, in an MPX file only one constraint can be set per activity.
You use this indicator to decide that a constraint on the finish is more important than a constraint on the start date.
Note
Since the constraints Finish from confirmation and Start from resource planning are not defined in MPX format, they are ignored for the transfer to a MPX file.
If one of the dates does not have a constraint, this indicator is not relevant.
History
Last changed by/on | SAP | 19990318 |
SAP Release Created in |