Hierarchy
⤷ FI-SL-SL (Application Component) Basic Functions
⤷ GPLN (Package) FI-SL planning
Basic Data
Data Element | FGDISPLAY |
Short Description | Ind.: Display field group in the summary/period screen? |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RADIOBUTT | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 22 | Display field group |
Heading | 6 | DispFG |
Documentation
Definition
This indicator controls whether the field group is displayed on the initial screen or on one of the following screens in planning.
Use
If the indicator is activated, the field group is immediately displayed in the planning overview or period screen.
The indicator controlling which field groups are displayed can be changed online at any time during planning.
Procedure
Examples
Note
You can display and edit a maximum of two field groups at the same time.
Supplementary Documentation - FGDISPLAY 0013
Use
Field group used to store plan and actual costs incurred during activity allocation. The values are translated from the controlling area currency and stored in the (receiver) cost center currency or order currency.
The SAP System uses the exchange rate type and the value date for the relevant version and current fiscal year for this calculation.
Procedure
This field group can only be displayed if the conditions stated in the note are met.
Examples
Dependencies
Note
This field group is only updated if the "Update all currencies" indicator is set for the relevant controlling area and fiscal year. If this indicator is not set, costs can only be calculated in controlling area currency.
Supplementary Documentation - FGDISPLAY 0014
Use
This field group is used to store the costs arising from a cost allocation; you can enter both planned and actual values for this field group. This value is stored in the controlling area currency and is determined from the result of the planned or actual quantity multiplied by the current planned rate in the controlling area currency.
Procedure
You can always display this field group.
Examples
Dependencies
Note
The costs in the (receiver) cost centers or order currency are also calculated from this field group and are updated if you have requested the update of all currencies in the control indicators of the controlling area for the relevant fiscal year. If not, you can only calculate the costs in the controlling area currency.
Supplementary Documentation - FGDISPLAY 0015
Use
This field group is used to store the costs arising from a cost allocation; you can enter both planned and actual values for this field group. This value is stored in the currency of the sender cost center and is determined from the result of the planned or actual quantity multiplied by the current planned rate in the sender cost center currency.
Procedure
You can only display this field group if the conditions in the note have been fulfilled.
Examples
Dependencies
Note
This field group will only be updated if you request the update of all currencies in the control indicators of the controlling area for the relevant fiscal year. If not, you can only calculate the costs in the controlling area currency.
Supplementary Documentation - FGDISPLAY 0016
Use
This field group is used to store the total of all activities that are being used by other CO objects (e.g. a cost center) in activity input planning.
Procedure
If you do not flag this field, you can still display this value.
Examples
Note
Supplementary Documentation - FGDISPLAY 0017
Use
The planned credit in cost center currency is calculated from the product of the planned activity quantity and the total or fixed activity price in cost center currency.
Procedure
If you want to display the planned credit in cost center currency in planning, you must check off this field.
If you do not check off this field, you can still display this value, provided the conditions are met for the update (see note).
Note
You can only display this field group if you have activated the "All currencies" indicator for the relevant controlling area and fiscal year. If the indicator is not active, only the planned credit in controlling area currency is displayed.
Supplementary Documentation - FGDISPLAY 0018
Use
The planned credit in controlling area currency is calculated from the product of the planned activity quantity and the total or fixed activity price in controlling area currency.
Procedure
If you want to display the planned credit in controlling area currency in planning, you should check off this field.
If you do not check off this field, you can still display this value.
History
Last changed by/on | SAP | 19920610 |
SAP Release Created in |