SAP ABAP Data Element FFZHI (Maximum Cumulative Production Go-Ahead Quantity)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     BBP_APPLICATION (Package) Structure Package EBP
       ME (Package) Application development R/3 Purchasing
Basic Data
Data Element FFZHI
Short Description Maximum Cumulative Production Go-Ahead Quantity  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG15    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 15    
Decimal Places 3    
Output Length 19    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Max. CPGQ 
Medium 15 Maximum CPGQ 
Long 20 Maximum Cum. PGQ 
Heading 19 Maximum Cum. PGQ 
Documentation

Definition

Maximum quantity of the material for which Purchasing commits itself to reimburse the vendor for material and production costs incurred.

Use

This is the cumulative scheduled quantity of schedule lines lying within the firm zone ("go-ahead for production" zone) in the case of scheduling agreements with release documentation.

This maximum cumulative quantity represents the largest quantity scheduled within the firm zone.

Example:
The maximum cumulative production go-ahead quantity is 1000 pcs. At the end of the period, your company has procured 900 pcs. from the vendor. The vendor invoices you for 1000 pcs. By reference to the maximum cumulative production go-ahead quantity, Invoice Verification personnel can satisfy themselves that the vendor is justified in doing this.

History
Last changed by/on SAP  19981111 
SAP Release Created in