SAP ABAP Data Element FE_NWA_WBS (Flag: Treat WBS assignment to NWA as flow for plan data?)
Hierarchy
EA-FIN (Software Component) EA-FIN
   FI (Application Component) Financial Accounting
     FERC (Package) IS-U/FERC: Regulatory Reporting
Basic Data
Data Element FE_NWA_WBS
Short Description Flag: Treat WBS assignment to NWA as flow for plan data?  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFIELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short  
Medium  
Long 40 Treat WBS assignment to NWA as plan flow 
Heading NWA 
Documentation

Note

This flag is only applicable to plan data.

Definition

If you mark this flag, then the assignment of a WBS element to a network activity is treated as a flow from the network activity to the WBS element simulating a settlement of the network activity.

The reason for this special treatment is that a network activity is not a fully integrated CO object for planning. Therefore, settlement from a network activity is only possible for actual data.

History
Last changed by/on SAP  20030704 
SAP Release Created in