SAP ABAP Data Element FAC_TARGET_BILL (Factory calendar for scheduled meter reading/billing date)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
Basic Data
Data Element | FAC_TARGET_BILL |
Short Description | Factory calendar for scheduled meter reading/billing date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KENNZX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 42 | Factory cal. for sched. MR/billing date |
Documentation
Use
The factory calendar is taken into account when calculating the scheduled meter reading or billing date.
Example
The start date is the end of the billing period and the target date is the scheduled meter reading date or billing date.
The interval between the start date and the scheduled date was defined as four days. The scheduled date must be before the start date.
- If the start date falls on a Friday, the scheduled date is the previous Monday.
- If the start date falls on a Wednesday, the scheduled date is:
- The previous Saturday if you have not maintained a factory calendar
- The previous Thursday if you have maintained a factory calendar.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |