SAP ABAP Data Element FAC_PRINT_CARD (Factory calendar for print date of customer MR order)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
Basic Data
Data Element | FAC_PRINT_CARD |
Short Description | Factory calendar for print date of customer MR order |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KENNZX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 42 | Factory cal. for printing of cust. MR ord. |
Documentation
Use
The factory calendar is taken into account when calculating the print date for the order for meter reading by the customer.
Example
The start date is the creation date of the meter reading order and the target date is the print date for the order for meter reading by the customer.
The interval between the start date and the scheduled date was defined as four days. The scheduled date must be before the start date.
- If the start date falls on a Friday, the scheduled date is the previous Monday.
- If the start date falls on a Wednesday, the scheduled date is:
- The previous Saturday if you have not maintained a factory calendar
- The previous Thursday if you have maintained a factory calendar.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |